mec325:design_project [2021.09.30 17:22] Fil Salustri [Milestone 1] |
mec325:design_project [2021.12.05 15:21] (current) Fil Salustri [Executive Summary] |
||
---|---|---|---|
Line 83: | Line 83: | ||
| [[# | | [[# | ||
| [[# | | [[# | ||
- | | [[#Detailed Design]] | '' | + | | [[#Detailed Design Specification|Detailed Design]] | '' |
| [[# | | [[# | ||
| [[#CAD Files]] | '' | | [[#CAD Files]] | '' | ||
Line 126: | Line 126: | ||
* a properly named and shared PCS document, | * a properly named and shared PCS document, | ||
* a properly named and shared Appendices document, | * a properly named and shared Appendices document, | ||
- | * a properly named and uploaded | + | * if you changed the contents of the PRS, you must have a revised PRS document available too, |
- | * completion of the corresponding | + | * properly named PDFs of the above documents, //stored in your team's Shared Google Folder//, |
+ | * Turnitin reports of the PAS and PCS documents, //stored in your team's Shared Google Folder//, | ||
+ | * (One team member can upload the PDFs to the LMS, wait for the Turnitin reports, then download those reports | ||
+ | * (The name of the Turnitin report would be the same as the PDF with '' | ||
+ | * completion of the MS2 tab of the [[design: | ||
+ | |||
+ | The Turnitin report is due within 48 hours after the deadline for the Milestone, to accommodate foreseeable delays by Turnitin. | ||
==== Executive Summary ==== | ==== Executive Summary ==== | ||
Line 141: | Line 147: | ||
* a summary of the highlights of your detailed design. | * a summary of the highlights of your detailed design. | ||
- | The executive summary can be no longer than 7 pages (cover page, team declaration page, and five pages of text as outlined above). | + | The executive summary can be no longer than 7 pages total (cover page, team declaration page, and five pages of text as outlined above). |
+ | |||
+ | Use full paragraphs in this deliverable; | ||
+ | |||
+ | Do not have any references in your Executive Summary. | ||
==== Detailed Design Specification ==== | ==== Detailed Design Specification ==== | ||
Line 150: | Line 160: | ||
References in [[https:// | References in [[https:// | ||
- | ==== Appendix 1 ==== | + | ==== Appendices ==== |
+ | === Appendix 1 === | ||
Solidworks Drawings - a //set of working drawings// of your product, sufficient to allow someone to actually assemble it. | Solidworks Drawings - a //set of working drawings// of your product, sufficient to allow someone to actually assemble it. | ||
* Insert drawings into your report in landscape mode, ensuring correct aspect ratio. | * Insert drawings into your report in landscape mode, ensuring correct aspect ratio. | ||
Line 161: | Line 173: | ||
* The CAD Drawings in this appendix are NOT " | * The CAD Drawings in this appendix are NOT " | ||
- | ==== Appendix 2 etc. ==== | + | === Appendix 2 etc. === |
Whatever other ancillary material you need to demonstrate and justify your design, such as data sheets on components you found on the web or in hard-copy catalogues, or for calculations you wish to include about how you designed your product (e.g. calculating forces, loads, velocities, component sizes, etc.) | Whatever other ancillary material you need to demonstrate and justify your design, such as data sheets on components you found on the web or in hard-copy catalogues, or for calculations you wish to include about how you designed your product (e.g. calculating forces, loads, velocities, component sizes, etc.) | ||