DesignWIKI

Fil Salustri's Design Site

Site Tools


design:project_workload_distribution_form

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
design:project_workload_distribution_form [2021.09.30 13:44]
Fil Salustri
design:project_workload_distribution_form [2021.10.06 18:03] (current)
Fil Salustri [At each milestone]
Line 139: Line 139:
 ==== How does the WDF affect Milestone grades? ==== ==== How does the WDF affect Milestone grades? ====
  
-Each Milestone tab has a column labelled ''WDF Score''. This is a normalized grade (out of 4) for the entire milestone, and relative to the rest of your team. You can use the [[https://docs.google.com/spreadsheets/d/1VNwrJ5ELYfcNYzcP2ocPbJcGmC3k4RCSi-Kyf1MMDNY/edit?usp=sharing|sample WDF sheet]] to play with the numbers and see the kind of impact resulting from changes in the milestone grades and the responsibility measures.+Each Milestone tab has a column labelled ''WDF Score''. This is a normalized grade (out of 4) for the entire milestone, and relative to the rest of your team. You can make a copy of a [[https://docs.google.com/spreadsheets/d/1VNwrJ5ELYfcNYzcP2ocPbJcGmC3k4RCSi-Kyf1MMDNY/edit?usp=sharing|sample WDF sheet]] to play with the numbers and see the kind of impact resulting from changes in the milestone grades and the responsibility measures.
  
 Your TA will grade your Milestone, which generates an overall grade. Your TA will put the grade of the Milestone into the blue cell. The sheet will automatically calculate your individual grade from that. Your TA will grade your Milestone, which generates an overall grade. Your TA will put the grade of the Milestone into the blue cell. The sheet will automatically calculate your individual grade from that.
design/project_workload_distribution_form.txt · Last modified: 2021.10.06 18:03 by Fil Salustri